Where every app has got to
Drag an app between columns. The stages are cumulative and ordered, which is the point: an app in production counts as having had its connections built and its UAT passed, so a progress figure cannot go backwards when somebody finishes something. Failed UAT sits at the same depth as UAT rather than beyond it — a failure is not progress — and blocked counts as nothing at all until it is cleared.






